River Side Table studio concept visual in grey stone, pale ash Design concept visual
Close detail of the River Side Table concept
Material & construction detail
River Side Table in the arrival concept scene
Room context

STH · STH-LB-03

River Side Table

A smooth oval stone top is carried by one offset timber support.

River Side Table is an original concept piece developed for the Stillness Hotel Collection. A smooth oval stone top is carried by one offset timber support.

Concept status

Visual and specification direction only. Final construction, compliance, testing and commercial feasibility follow project selection.

Applications
Lobbies, reception lounges and social spaces
Concept dimensions
W 560 × D 460 × H 480 mm
Material direction
Honed river stone or porcelain, solid ash

Room context · Arrival

The Quiet Arrival

Open complete scene →
River Side Table shown in the arrival concept scene
In context · Arrival Open scene ↗

Concept Sheet

A clear starting point for project development.

The dimensions and materials establish design intent. They are expected to evolve around the project brief, factory engineering, mock-up findings and applicable standards.

Pale Ash

Pale Ash

Charred Timber

Charred Timber

Natural Linen

Natural Linen

Concept code
STH-LB-03
Applications
Lobbies, reception lounges and social spaces
Concept dimensions
W 560 × D 460 × H 480 mm
Material direction
Honed river stone or porcelain, solid ash
Construction intent
Concept-stage occasional table with a stable contract base, protected surface and concealed floor glides.
Finish direction
Grey stone, pale ash
Customisation scope
Diameter, height, top material, base finish and grouped configurations
Development status
Concept design only. Final engineering, mock-up, performance testing and factory approval are required before manufacture.

Complete the Lobby

Related concept pieces

View the complete scene →

STH-LB-03 · Concept design

Develop the River Side Table for your project.

Share quantities, plans, finish references and performance requirements to begin feasibility and engineering review.

Discuss this concept