Container & CBM Calculator
Enter the package, count, packed size and gross weight; the tool infers handling and ranks a furniture container plan.
OutputRecommended equipment route, door/geometry screen, payload and volume gates, VGM checklist and CSV
- 01Frame the brief→
- 02Check controls→
- 03Issue output✓
MethodologyAuthority basis, review gates and live sources.
BSA Project IntelligenceContainer & CBM Calculator
MethodBSA-LOG-M03.1
Method reviewed21 Aug 2026
Control statusUncontrolled draft
Methodology
Calculate from four plain-language package inputs: identity, final package count, packed size and gross package weight. Infer the combined stackability/orientation profile from the package description while keeping it visible, correctable and resettable to automatic. Derive loading utilisation plus volume/weight reserves from packaging maturity, screen door and internal geometry, compare volume and payload, then rank the fewest suitable standard dry containers by unused planning capacity.
Required review gates
- Use measured packed dimensions and gross package weights
- Resolve every door, geometry and special-handling hold
- Confirm the actual carrier series, route payload and inland limits
- Approve the loading, lashing, dunnage and SOLAS VGM plan
Authority & standards register
Live links · issue must be reconfirmed| Issuer | Reference | Applied scope | Project evidence action |
|---|---|---|---|
| Hapag-Lloyd | Container Specification ↗ | Representative fleet-series internal dimensions, door openings, weights, capacities and ISO type codes | Fleet series vary; use the released equipment data for final geometry and payload decisions |
| Maersk | Container equipment data model ↗ | Official dry-container size, volume and payload planning reference | Country, route, road and actual equipment limits may be lower |
| IMO | SOLAS verified gross mass ↗ | Shipper responsibility and VGM condition for vessel loading | Cargo-mass arithmetic is not VGM; use an accepted certified weighing method and actual container tare |
The result is a pre-booking scenario. Container availability, certified limits, road weights, lashing, axle distribution and physical loadability remain with the shipper, carrier and freight specialist.
Furniture shipment brief
Add the packed packages; the shipping assumptions build themselves
Container planning decision
Planning route-
Raw packed volume0.00 m³
Planning volume0.00 m³
Planning cargo mass0 kg
Recommended loading route
Resolve booking controls before carrier releasePricing route
The generated decision state sets the correct commercial route.Complete container loading dossier Planning basis, equipment comparison, package schedule and carrier references. Review dossier ↓
Derived planning basis
One confidence choice replaces three arbitrary settingsEquipment comparison
Automatic route ranks container count, geometry and unused planning space| Equipment | Package fit | Planning capacity | Payload cap | Container count | Governing limit | Average use |
|---|
Calculated package schedule
Every automatic allowance remains visible| Package | Raw volume | Handling route | Planning volume | Cargo mass | Door / geometry screen |
|---|
Current carrier and VGM references
Status checked 20 Aug 2026 Hapag-Lloyd · Container Specification
Representative fleet-series internal dimensions, door openings, payloads, capacities and ISO size/type codes.Open ↗ Maersk · equipment data model
Official planning reference for dry-container sizes, volume and payload; route/country limits may be lower.Open ↗ IMO · SOLAS verified gross mass
The shipper must provide VGM before loading; this cargo-mass screen is not the verified gross mass.Open ↗
Representative fleet-series internal dimensions, door openings, payloads, capacities and ISO size/type codes.Open ↗ Maersk · equipment data model
Official planning reference for dry-container sizes, volume and payload; route/country limits may be lower.Open ↗ IMO · SOLAS verified gross mass
The shipper must provide VGM before loading; this cargo-mass screen is not the verified gross mass.Open ↗
The ranked route is a conservative pre-load scenario, not proof of physical loading. Reconfirm the released unit, country/road limits, axle and floor loads, weight distribution, lashing, dunnage and SOLAS VGM with the carrier and freight specialist.