Numbered technical specification
Supplier to return clause-by-clause deviationsProduct-specific evidence matrix
Method and acceptance criteria require project confirmation| Performance area | Candidate route | Required supplier evidence | Acceptance owner |
|---|
Submittal and inspection hold points
No production beyond an unresolved hold point| Gate | Supplier submission / inspection | Acceptance control | Release state |
|---|